Westside Park at Bellwood Quarry is a park in the City of Atlanta located on the site of the former Bellwood Quarry. The park is between Johnson Road and Donald Lee Hollowell Parkway and between the neighborhoods of Bankhead, Grove Park, and Knight Park/Howell Station. A large portion of the park falls within the Grove Park boundaries. Westside Park at Bellwood Quarry was a major green space project of the Atlanta BeltLine master plan. The park has trail connectivity to the Proctor Creek Greenway Trail (Phase 1) and will ultimately have connectivity to the BeltLine.
Westside Park | |
---|---|
Type | Public park |
Location | Atlanta, Georgia, United States |
Coordinates | 33°46′51″N 84°26′10″W / 33.7809°N 84.4362°W |
Status
editThe land, which was owned by Fulton County, was previously leased to Vulcan Materials. On December 10, 2005, Atlanta Mayor Shirley Franklin announced a plan to acquire the lease and the land in order to create a 351-acre (1.42 km2) park with a 45-acre (180,000 m2) lake which would also serve as a drinking water reservoir. The plan was a portion of the extensive BeltLine project to construct a ring of parks, trails, and transit surrounding the core of Atlanta. As proposed, Westside Reservoir Park was nearly twice the size of Atlanta's premiere greenspace, Piedmont Park. Acquisition by the city was completed on June 30, 2006.[1]
On December 29, 2017, outgoing mayor Kasim Reed unveiled plans for phase one of the park's construction. The cost of the first phase was approximately $26.5 million. Phase one includes a gateway to the park, a "grand overlook" of both the quarry and the Atlanta skyline, and pedestrian connections to the Proctor Creek Greenway.[2]
On September 6, 2018, the official groundbreaking took place for Westside Reservoir Park.[3]
On August 27, 2019, Westside Park at Bellwood Quarry received a major boost with the announcement that the Arthur M. Blank Family Foundation had awarded a $17.5 million grant for the BeltLine project. The Blank grant accelerated the development of parks and trails along the 22-mile circular corridor – especially on the Westside.[4]
At a ribbon-cutting ceremony on August 20, 2021, Atlanta's Westside Park was opened to the public.[5]
Bellwood Quarry
editThe former granite quarry, which closed in 2007, was a popular hangout spot for local teens. The site was used as a location for the filming of the AMC's series The Walking Dead in the summer of 2010. It was also used as a filming location for season four episode 14 of The Vampire Diaries, a scene in Mockingjay Part 1, and the final scene of The Fundamentals of Caring. In 2016, it was featured prominently in several episodes of the Netflix series Stranger Things.[6]
During construction of the reservoir and the park, the area was closed to the public. A five-mile tunnel was dug to access water. The reservoir began filling in April of 2020,[7] and completed filling in February 2021.[8]
References
edit- ^ "Bellwood Quarry sold to city". Atlanta Business Chronicle. Retrieved January 2, 2022.
- ^ "Mayor Kasim Reed Unveils Plans for the Future Westside Park at Bellwood Quarry". City of Atlanta, GA. Retrieved January 2, 2022.
- ^ Trubey, Scott. "Atlanta breaks ground on city's biggest park at Bellwood Quarry". The Atlanta Journal-Constitution. AJC. Retrieved January 2, 2022.
- ^ "Arthur M. Blank Family Foundation, Atlanta Beltine Partnership announces $17.5-million grant to support Westside Park". The Atlanta Voice. August 28, 2019. Retrieved January 2, 2022.
- ^ Capelouto, J.D. "Westside Park, Atlanta's largest park, is now open to the public". The Atlanta Journal-Constitution. Retrieved January 2, 2022.
- ^ "Georgia Locations for Netflix's 'Stranger Things'". Deep South Media. July 28, 2016. Retrieved January 1, 2017.
Georgia's small towns outside of Atlanta, including Douglasville, Conyers, Jackson, Winston and Fayetteville, easily pass for the Midwest, and Jackson's intact downtown isn't a far stretch from 1983 Hawkins on film.
- ^ "Water Begins Flowing into Bellwood Quarry". WABE. April 17, 2020. Retrieved April 20, 2020.
- ^ "Atlanta's Emergency Water Supply Project At Bellwood Quarry Is Complete". WABE. February 15, 2021. Retrieved October 8, 2023.