Ings Regeneration, Phase 2c: Construction is in progress of dwellings at The Leeway, between Middlesex Road and the former Battersea Close for Compendium Living. Approved by the City Council 21 May 2009. Depicted are completed houses in Southgate Way at the junction with No. 45 Battersea Park.
Ings Regeneration, Kingston upon Hull

Due to the nature of their construction, Caspon houses built in the 1960s have been demolished to create cleared sites for nearly 800 new dwellings in a series of phases. The dwellings are designed to be a mix of three to five bed units, and a smaller number of two bedroom bungalows. A mix of tenures will include houses for sale on the open market and houses for rent, through a registered social landlord. Homes for open market sale are by Compendium Living; those for shared ownership by Together Housing. The overall masterplan includes a number of green spaces, some with soft landscaping and some with play equipment for younger children. Due for completion in 2027. Lovell overview: LinkExternal link All the roads are named after places in London.

The new-build phases were/are as follows:
A: Camberwell Way: 27 dwellings in 2005
B: Camberwell Way: 32 in 2007
C: Camberwell Way, Mitcham Road, Barking Close, Highgate Close: 127 in 2009
D: Land between Mitcham Road and Twickenham Close: 56 in 2013
1: Perivale Close / Petersham Close: 65 completed in 2016
2a: Middlesex Road / Saltshouse Road: 68 completed in 2019
2b: Middlesex Road / Chelsea Close: 102 started in 2024
2c: Battersea Close / Saltshouse Road: 108 started mid-2019; completed
3a: Bellfield Avenue / Acton Close: 166 proposed (with 3c and 4a)
3b: Surbiton Close / Bellfield Avenue: 83 completed March 2018
4: Barnet Close and N of Bellfield House: to be confirmed
5: Balham Avenue: 84, due to start late 2025 and complete late 2027
Bellfield Day Centre: potential future phase
See map for locations 1 to 5: LinkExternal link


Creative Commons Licence [Some Rights Reserved]   © Copyright Bernard Sharp and licensed for reuse under this Creative Commons Licence.
Geographical Context: Housing, Dwellings Suburb, Urban fringe Construction, Development other tags: Ings Ward Click a tag, to view other nearby images.
This photo is linked from: Automatic Clusters: · Middlesex Road [139] · City Council [61] · Park [39] · Ings Regeneration [27] · Battersea [24] · Phase 2c [12] Title Clusters: · Battersea Park, Kingston upon Hull [11] ·
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for more Large scale mapping
Grid Square
TA1232, 665 images   (more nearby 🔍)
Photographer
Bernard Sharp   (more nearby)
Date Taken
Sunday, 18 May, 2025   (more nearby)
Submitted
Monday, 19 May, 2025
Subject Location
OSGB36: geotagged! TA 1280 3235 [10m precision]
WGS84: 53:46.5166N 0:17.3894W
Camera Location
OSGB36: geotagged! TA 1278 3235
View Direction
EAST (about 90 degrees)
Clickable map
+
NW N NE
W Go E
SW S SE
Image Type (about): geograph 
This page has been viewed about 19 times
You are not logged in | login | register